Before submitting a load-in application, an owner shall properly coordinate with relevant agencies and organizations such as terminals, ports, pipeline companies, customs, and commodity inspection agencies. Before loading LSFO into a Designated Delivery Storage Facility, the owner shall submit a load-in application to the Exchange no less than 15 days before the proposed load-in date. Where the load-in application is submitted less than 15 days before the proposed
load-in date but the owner is otherwise prepared for the load-in and the
Designated Delivery Storage Facility raises no objection over the loadin, the Exchange may approve the application based on the available storage capacity and other factors. The validity period of an LSFO loadin application is 15 days from the date of approval by the Exchange.The owner must ensure that information and documents for the loadin application are true, and need to pay a load-in deposit of RMB 30/metric ton.
声明:本资料仅用于投资者教育,不构成任何投资建议。我们力求本资料信息准确可靠,但对这些信息的准确性、完整性或及时性不作保证,亦不对因使用该等信息而引发的损失承担任何责任,投资者不应以该等信息取代其独立判断或仅根据该等信息做出决策。基金有风险,投资须谨慎。